No. 134585
Hello, I am selling a WGW rubber waste processing installation.
1.2. Installation parameters
• weight of the entire device with components - approx. 35,000 kg;
• weight of the crushed tire input - max. 12,000 kg;
• dimensions of the loading chamber including the insulating casing (length x width x height) - 8,500 x 3,000
x 3,500 m;
• capacity of tanks for oil products - 2 x 8,000 l;
• gas product tank capacity - 1 x 4 m3
• heating power of three burners - 480 kW;
• electric drive motor - 4 kW/8.1 A;
• cooling system capacity - 2,000 l;
• amount of water in the condenser - 400 l (capacity of 4 condensers 1,600 l);
• cooling system power - 430 kW;
• cooling system connection power - 10 kW/44 A;
• dimensions of the complete installation (length x width x height) - 18,000 x 6,000 x 5,000 m;
• process torch PPT/W/FA/0203/WGW8: thermal power - max. 400 kW;
• the time of one full production cycle (from the moment of starting the loading of tires,
sealing the reactor and starting heating until it cools down, opening
reactor and removal of steel scrap and char) - approx. 18-24 h (depending on conditions
weather, season, input used);
• the installation is pressureless - the maximum pressure achieved was 0.42 bar.
Installation after several technological tests. To be viewed in Malbork near Gdańsk.
Pyrolysis line installed in a production hall on a 1.8 ha plot with infrastructure: transformer station, production hall, warehouse, parking lots, maneuvering area, social container.
Environmental decision issued. Recovery R3,R12. Precipitation codes: 070280,160103,191204,191210,191212.
Industrial area.
The price is for installation only.
Possible purchase of the entire lot - PLN 4,999,000.
Plastech is not responsible for the content of offers. The only owner of it is the user that published it at Plastech..